Project Overview:
— The construction phase will commence in June 2026
The project is located in Hanwood, New South Wales. The project includes a 7.13 megawatt solar photovoltaic power plant with a 10 MWh battery energy storage system (BESS) integrated and connected to the 22 kV main grid.
Power generation capacity:
7.13 megawatt panel + 10 megawatt-hour battery energy storage system (BESS) 20MWh (Option)
Location: Hanwood, NSW – Riverina, NSW
Power grid: TransGrid 22 kV
Connection voltage: 22kV
Lease term: 25 years
Key Components:
Solar panels: 11,320 x 630 watt panels (7.13 megawatt installed capacity)
Inverter: 1 Sungrow SG4950HV-MV inverter
Proposed connection: 4.95 MW (access review will be carried out in development progress)
Annual energy production: 15,118 megawatt-hours per year when 7.13 MW panels are installed
Battery energy storage: 4 Sungrow ST2752UX batteries (2.752 MWh each) – 10 MWh total